Product case study · 2026

Sable Build | Drag-and-Drop Website Builder with Multi-Stack Code Export

An in-progress website-building platform designed as a more flexible alternative to WordPress, Shopify, and Wix. Its defining feature is complete code export in the user's preferred language, framework, and database stack.

Build a complete site visually in ~20 minutes and export clean, production-ready code across 20+ frontend/backend stacks with zero vendor lock-in.
Sable Build | Drag-and-Drop Website Builder with Multi-Stack Code Export feature screenshot
Sable Build | Drag-and-Drop Website Builder with Multi-Stack Code Export interface overview
( 01 )
About Project

Sable Build is an in-progress website and application builder created as a more flexible alternative to platforms such as WordPress , Shopify , and Wix .

Users can visually create responsive, multi-page projects, manage layouts, assets, design tokens, and dynamic data, and extend a project with application features from one connected workspace.

Its most advanced capability is freedom at export : users can choose their preferred programming language, frontend framework , backend framework , and database . Sable Build then exports the project for that selected stack, giving users ownership of their code without platform lock-in.

( 02 )
Tech Stack & Features

Technology Stack

The main Sable Build platform is built with Next.js, Zustand, and MongoDB. Its export engine supports more than 20 technologies across languages, frameworks, backends, and databases, including MySQL, MongoDB, PostgreSQL, Python, and Go.

Next.jsZustandMongoDB20+ Technologies

Key Features

The core capabilities that shape this project's experience and workflow.

01

Drag-and-drop visual builder with sections, boxes, grids, flex layouts, forms, and reusable components

02

Responsive editing controls for mobile, tablet, and desktop breakpoints

03

Multi-page project builder with authentication pages and per-page structure

04

AI block generation from plain-language prompts

05

AI-assisted editing, refactoring, content writing, and section suggestions

06

Editable starter templates for SaaS, ecommerce, portfolios, blogs, agencies, restaurants, and more

07

Project dashboard for creating, searching, opening, and managing builds

08

Media library with drag-and-drop uploads and reusable project assets

09

Global design system for shared colors, typography, and visual tokens

10

Block-level controls for dimensions, spacing, borders, appearance, position, and layers

11

CMS and dynamic content collections connected to external databases

12

Database support for MongoDB, MySQL, PostgreSQL, Firebase, and Supabase

13

Plugin support for authentication, carts, orders, payments, analytics, and integrations

14

Built-in project preview, save state, undo, and redo controls

15

Basic SEO controls for page metadata, Open Graph tags, and canonical URLs

16

Complete code export using the user's preferred language, framework, backend, and database

( 03 )

User Interface Showcase

A selection of key interfaces from the project, showcasing core user workflows, essential features, and responsive design.

01

Product Home

Introduces the visual builder, AI workflow, supported stacks, templates, and zero-lock-in export model.

02

Project Dashboard

Create, search, open, and manage visual projects from a focused builder workspace.

03

Visual Builder

Compose multi-page interfaces with layout blocks, live responsive controls, layers, and block settings.

04

Design System

Control shared colors and typography while editing the project directly on the canvas.

05

Data & CMS

Connect a database and define structured collections for dynamic application content.

06

Media Library

Upload, organize, and reuse visual assets across every page in a project.

( 04 )

Project Workflow

A project moves from setup into a unified builder where pages, components, assets, design tokens, data, plugins, and AI assistance work together before preview, save, and multi-stack export.

Have something in mind?

Let’s turn your idea into something people want to use.

From the first product decision to the final interface, I can help you design and build the complete experience. Either it is website, mobile app or AI based application, I will design and build it from scratch.

Start a conversation

Contact Me

Get in Touch

Feel Free to Reach Out

I am excited to connect! Whether you have a project idea, need assistance, or just want to chat about tech, feel free to reach out.